CASE STUDIES

Barrington High School

INDUSTRY: Education
LOCATION: Barrington, IL
PRODUCT: ROI, Eurotech, Interface
TYPES OF STATIONS: 5 Bullet Top Computer Stations
INSTALL TIME: 1 Day
MANUFACTURING TIME: 1 Week

 

THE CHALLENGE

Barrington School District 220 needed to take a typical classroom and turn it in to a space that would have the “wow factor” for their new entrepreneurial incubator. They were in need of a build out that would develop and foster creativity in high school students while also accommodating current and future technology needs.

 

THE SOLUTION

By combining different types of collaboration spaces, technology tables, white board walls, bold graphics and a brain bar, an energized and inspired space was achieved for teenagers to meet, discuss, and collaborate.

 

THE RESULTS

The the design of entrepreneurial incubator encourages students to engage and interact in new ways. The new space provides the collaborative environment and resources the students need to succeed.

 

“We went to ROI with an idea; create a state-of-the-art classroom that embraces group learning. ROI came back with a variety of cutting edge options and executed on the chosen option with precision, on-time, and on-budget. Now we have a world class room for education and a relationship to do it again.” – Karl Fruecht


BEGIN CREATING YOUR WORKSPACE WITH ROI:

 

Begin Creating Your Workspace


 

2000 Fox Lane
Elgin, IL 60123-7814
Phone: 847.622.9711
Fax: 847.622.9750